Buying a house in Manchester? The electrical checks worth doing before you exchange
By the Mister Electrics team·Updated September 2026·6 min read
The short answer
A standard house survey barely looks at the electrics. A £150 EICR before exchange tells you whether the installation is safe, what needs fixing and roughly what it costs, which is either peace of mind or several thousand pounds off the price. Red flags on a viewing: a fuse box with rewirable fuses, round-pin sockets, fabric-covered cable and no certificates for any recent work.
What a surveyor actually checks
A RICS Level 2 or 3 survey is a visual inspection. The surveyor will look at the consumer unit, note its age and type and write something like "the electrical installation appears dated and should be tested by a qualified electrician." They do not test anything, because testing is outside the scope of a survey. That sentence appears in a large proportion of Manchester survey reports on pre-1990 houses.
It is a prompt, not an answer. The answer is an EICR.
Red flags you can spot on a viewing
You do not need to open anything. Look for:
- A fuse box with ceramic rewirable fuses or a wooden back board
- Round-pin sockets, or sockets mounted in skirting boards
- Fabric or rubber-covered cable visible at the board, in the loft or under the stairs
- Only one or two sockets per room, or trailing extension leads everywhere
- Light switches with brass or Bakelite surrounds throughout
- A newish kitchen or extension with no certificate mentioned in the seller's paperwork
- Scorch marks or a hot plastic smell at the board
When to get an EICR and what it costs
After your offer is accepted and before exchange. It costs £150 for most houses, takes two to three hours and the seller or agent rarely objects because the alternative is a buyer walking away. You get a report the same day graded Satisfactory or Unsatisfactory with each item coded and explained.
An Unsatisfactory report is not a reason to pull out. It is a costed list. We give you an itemised price for the remedials so you can negotiate with real numbers rather than a surveyor's vague warning.
What typical fixes cost in 2026
The most common outcomes on Manchester purchases, with our prices including VAT:
- Consumer unit upgrade to an RCBO board: £449 to £649
- Earthing and bonding to gas and water: £120 to £250
- Partial rewire, kitchen and bathroom circuits: £1,200 to £2,000
- Full rewire of a three-bed semi: £3,800 to £5,200
- Interlinked smoke and heat alarms: from £260
- Retrospective certification of uncertified work: usually needs an EICR plus remedials, £150 upwards
Paperwork to ask the seller for
Ask for the Electrical Installation Certificate for any rewire or new circuit, the Building Control compliance certificate for notifiable work such as a new consumer unit, a new circuit or work in a bathroom, and any EICR from the last ten years. If the seller has had a rewire, a new board or an extension wired since 2005 and cannot produce a compliance certificate, the work was probably not notified. That is fixable but worth knowing before you agree a price.
Once you own the house, the same rule applies in reverse: keep every certificate with the deeds. It is one of the first things the next buyer's solicitor will ask for.
Questions people also ask
Can I get an EICR before I own the house?
Yes, with the seller's permission for access, which agents arrange routinely. The report is addressed to you as the person who commissioned it.
Will the mortgage lender require electrical work?
Rarely as a condition, but a surveyor's comment can lead to a retention until work is done. An EICR showing Satisfactory, or a quote for remedials, usually settles it.
How long does an EICR stay valid?
For a homeowner there is no legal expiry, but ten years or at change of occupancy is the recommended interval. If you later rent the house out, you need one every five years.
Written by qualified electricians working to BS 7671:2018+A2:2022 in Greater Manchester. Prices are our own 2026 rates including VAT and are a guide until quoted in writing. This is general information, not a substitute for an inspection of your installation.